ADEX News
Deprecated: Function split() is deprecated in /usr/home/adexcop.com/web/information-center.php on line 93
2012-01-13
MAX team is delighted to announce a "world premiere": the first coupling of the GUINEVERE experimental ADS reactor
The Belgian Nuclear Research Centre (SCK-EN) in Mol, successfully coupled a reactor to a particle accelerator. For the first time in
2011-12-23
First application of ADEX control to the simulation of the 700 MHz Cavity at the Institut de Physique Nucleaire (IPN) in Orsay
In the second week of December 2011, ADEX engineers, in conjunction with the IPN team of the Centre National de la Recherche Scientifique
2011-09-19
Scottish Power signs contract for optimised control of biological process at waste water treatment plant in Daldowie
Following an initial demonstration of the benefits, ADEX will instal an optimised ADEX control system at the Daldowie waste water plant in


